Goole Market Hall, a historic Victorian building within a designated conservation area, was undergoing transformation from years of abandonment into a vibrant food, drink and event venue. The exposed brick walls were heavily contaminated with decades-old lead-based paint that posed significant health and environmental risks. The challenge was to safely remove all lead contamination while preserving the building’s historic character and ensuring zero environmental impact in this sensitive urban location.
Client: W M Birch & Son
Location: Goole Market Place, East Yorkshire
Project Type: Heritage Building Restoration – Environmental Remediation
Project Duration: Three weeks
Contract Value: c. £20,000
The Brief
Complete removal of lead-contaminated paint from exposed brickwork throughout the market hall, executed to the highest environmental safety standards. With active construction happening simultaneously and public access nearby, containment and safety protocols were paramount.
Project Requirements:
- Zero Environmental Contamination – No lead particles released into the surrounding area
- Minimal Operational Disruption – Coordinate seamlessly with other trades and contractors
- Heritage Compliance – Preserve historic brickwork integrity whilst removing all contamination
- Tight Deadline – Complete within a three-week window to maintain the overall project schedule
Our Approach
RM Contractors brings specialised expertise in hazardous material removal within heritage environments. Our certified team utilises cutting-edge containment technology and follows strict HSE protocols to ensure complete safety whilst preserving architectural integrity.

How We Delivered:
Planning & Design Phase:
- Comprehensive site survey identifying contamination extent and brick condition
- Detailed method statements and risk assessments
- Coordination meetings with heritage consultants and other contractors
- Equipment mobilisation and site establishment planning
Execution Phase:
- Phased approach to minimize disruption to ongoing works
- Advanced containment systems preventing any particle escape
- Specialised abrasive blasting techniques suitable for historic brickwork
- Continuous air monitoring and quality control testing
Project Management:
- Daily progress reporting to client and main contractor
- Real-time coordination with other trades
- Rigorous safety monitoring and documentation
- Heritage compliance verification at each stage
The Build
Technical Execution
Our team established comprehensive containment zones systems and specialised techniques to create safe work areas. We employed controlled abrasive blasting using appropriate media grades that effectively removed lead paint while preserving the Victorian brickwork’s surface integrity. Water suppression ensured that no lead particles were released into the atmosphere.

Scope of Work Completed:
- Main Hall Areas: Complete lead paint removal of exposed brickwork, revealing original Victorian pointing and brick character
- Architectural Features: Careful remediation around window reveals, decorative arches, and cornicing without damage to historic details
- Service Areas: Lead contamination removal from utility areas and access corridors, coordinating around new mechanical installations
Specialised Techniques:
- Variable pressure abrasive systems adjusted for different brick conditions
- Selective paint removal preserving underlying lime mortar joints
- Water suppression to prevent contamination release
- Comprehensive quality control procedures and protocols
Project Outcomes
The project successfully transformed a contaminated heritage building into a safe, clean environment ready for its new commercial purpose. All lead contamination was completely eliminated while preserving the building’s Victorian character, enabling the client to proceed with confidence to the next restoration phases.

Results Delivered:
- Timeline: Completed on schedule despite challenging working conditions
- Budget: Delivered exactly on budget with no variations or additional costs
- Environmental Compliance: Achieved zero detectable lead release – exceeding all regulatory requirements
- Heritage Preservation: Victorian brickwork fully restored to original condition with no damage to historic fabric
- Safety Record: Zero incidents or exposures throughout the project duration
Why This Project Succeeded
Specialised Expertise: Our team’s deep experience in heritage building remediation and hazardous material removal proved essential for navigating the complex technical and regulatory requirements.
Advanced Technology: Investment in cutting-edge containment and abrasive systems enabled us to achieve complete contamination removal while protecting surrounding areas and preserving historic fabric.
Collaborative Approach: Seamless coordination with other contractors, heritage consultants, and regulatory bodies ensured the project progressed smoothly without delays or complications.
Ready to Start Your Heritage Restoration Project?
RM Contractors (UK) Ltd specialises in complex environmental remediation within heritage and conservation environments. Contact us today to discuss how our expertise can support your restoration needs.